
Atlas Roofing recently introduced the Summit 60 Synthetic Underlayment to be used with shingles. The company will donate $2 from each roll of the synthetic underlayment to the Susan G. Komen foundation for breast cancer research. These special pink-colored rolls, which will be embossed and branded with pink ribbons, will be made available to contractors through Atlas Roofing distributors.
Summit 60 is a good choice for roofs with slopes from 4:12 to 7/12. If you want double coverage, use an underlayment 24” in thickness and fasteners through both layers. The overlapping is necessary because the underlayment needs to be secured by a tarpaulin, which is an unsightly sag. Installing Summit 60 will help protect your deck and prevent damage from water.

Summit 60 underlayment offers excellent moisture resistance. It is water resistant and UV protected, protecting your roof from water and ice. It stops water from getting under the decking. The underlayment is made of polymeric scrim, which is stronger than traditional felt. It also provides enhanced strength and minimizes slippage between the underlayment and the roof sheathing. The additional benefits of Summit 60 include enhanced walkability during installation and sixty-day UV protection.
Before you install any underlayment, it must be properly installed. First, determine what type of roof deck it is. If your roof deck is ventilated, you can then install Summit (r-60). You can install Summit 60 on slopes of 4:12 or 7/12. This means that the overlaps should not exceed 24 in between the layers. You should use plastic cap fasteners of a minimum one-inch diameter and one-inch length to prevent leakage.
Summit 60 was designed to increase the roof's lifespan and reduce water and UV penetration. It offers superior UV protection and water resistance. It prevents slippage from the roof sheathing to the underlayment. The underlayment lasts a long period of time and is very durable. It has great walkability. The synthetic underlayment has been UV-coated to increase strength and durability.

Summit (r.60) should first be applied to roof decks that are solid and clean before you apply the synthetic underneathlayment. This is a double-coverage technique. This means that you must ensure that the sheets are properly installed. Instead of having four layers, the overlapping should be 24 inches. Adhesives are available to bond the layers. Summit (r-60) must only be installed by licensed roof contractors.
FAQ
Is it more expensive to remodel an existing house than to build one new?
If you're thinking about building a new home, there are two options for you. Pre-built homes are another option. These homes are ready to be moved into and have already been built. You also have the option to build your home from scratch. If you choose this option, you will need to hire someone to help you design your dream home.
How much time and money it takes to design and plan a new house will affect the cost. You'll probably need to do the majority of the construction work yourself if you build a custom home. This will require more effort. You also have greater control over the materials and their placement. It might be simpler to find a contractor specializing in building custom homes.
A new house is generally more expensive than a home that has been renovated. This is because you will have to pay more for the land as well as any improvements that you make to it. Permits and inspections are also required. On average, the price difference between a new and remodeled home is $10,000-$20,000.
How important it is to be pre-approved for loans?
Pre-approval is crucial for getting a mortgage. It gives you an idea how much money it will cost. It also helps you determine whether or not you qualify for a particular loan program.
How long does it usually take to renovate your home?
It depends on the size of the project and the amount of time that you spend each day. The average homeowner spends between three to six hours per week on the project.
How should house renovations be ordered?
You must decide where everything will go when you renovate your home. If you plan to sell your home soon, then you should think about how you would like to present your home to potential buyers. Next, you should start thinking about the design of your kitchen, bathroom, living room, etc. After you have selected the rooms you wish to renovate you can begin searching for contractors who specialize. You can then begin your renovations once you have hired an expert contractor.
Statistics
- It is advisable, however, to have a contingency of 10–20 per cent to allow for the unexpected expenses that can arise when renovating older homes. (realhomes.com)
- Rather, allot 10% to 15% for a contingency fund to pay for unexpected construction issues. (kiplinger.com)
- A final payment of, say, 5% to 10% will be due when the space is livable and usable (your contract probably will say "substantial completion"). (kiplinger.com)
- The average fixed rate for a home-equity loan was recently 5.27%, and the average variable rate for a HELOC was 5.49%, according to Bankrate.com. (kiplinger.com)
- Most lenders will lend you up to 75% or 80% of the appraised value of your home, but some will go higher. (kiplinger.com)
External Links
How To
What amount should I spend to restore my old house?
The cost to renovate your home will vary depending on how many rooms are being renovated, which type of renovations you do, where you reside, and whether or not you are hiring professionals. Depending on the scope and size of the project, the average renovation cost is between $10,000 and $50,000.
If you're planning to sell your home after the renovation, you'll likely receive less than market value if you don't take into account the costs of repairs, upgrades, and improvements. You could lose money if the home is not maintained in a good condition before selling. However, investing enough energy and time into improving the appearance of your home can help increase the value you get for it when you list it.
These are some factors that will help you determine which projects you should start:
-
Your budget. You can start small if you have limited funds. Start small. For instance, you could tackle one room at once, such as replacing flooring or painting walls. To make big changes, you can hire a contractor who is skilled in kitchen remodeling.
-
What are your priorities? What are your priorities? Do you want to improve your home's overall condition or fix specific issues? You should not limit your efforts to one problem. Even minor problems can quickly add up. For instance, if your roof leaks every time it rains, you might end up having to replace it sooner rather than later.
-
Your timeline. You might prioritize projects that will not affect your home's resale price if you are considering buying another property. If you are looking to purchase a new home next year, for example, you might not want to replace your bathroom fixtures or install hardwood floors right away. To make these upgrades, it might be a good idea to wait until you leave your home.
-
Your skills. You might not have the skills to complete a project. If your carpentry skills don't allow you to build custom cabinets, then it might be possible to hire a cabinetmaker to help you.